How to Check an MCS Installer on the Register (UK 2026)
How to look up a heat pump installer on the MCS register, read each field, and confirm Boiler Upgrade Scheme eligibility before you sign.

The MCS certification number on a heat pump quote is the one credential you can check for yourself in under five minutes, and the one the £7,500 grant depends on. This guide is the deep-dive on that single check: where the lookup lives, how to read each field on the installer record, what a match proves and what it leaves open, and how the record ties to Boiler Upgrade Scheme eligibility. For the other five checks (F-Gas, case studies, reviews, insurance, quote transparency), use our six-check guide to vetting an MCS heat pump installer.
MCS (the Microgeneration Certification Scheme, the UK standards body for small-scale renewable installations) certifies installer businesses, not individual engineers. A certification body such as NAPIT or NICEIC assesses the business against MCS standards and keeps it under surveillance; MCS publishes the result on its public register.
How do you look up an installer on the MCS register?
Copy the certification number from the quote
MCS certification numbers carry no single fixed format. Many start with the certification body's prefix (for example NAP for NAPIT) followed by digits. Copy it exactly as printed on the quote, the website footer or the email signature. If none of those show it, ask in writing: "What is your MCS certification number for heat pumps?"
Open Find an Installer on mcscertified.com
Find an Installer is the public MCS search for certified businesses. It is free and needs no account. It offers two routes: a Quick Search by installer name or certification number, and a search by technology plus location (your address, or a nation and region).
Search the number first, then the name
Search the certification number in Quick Search. A matching record confirms the number is live. Then search the company name on the quote separately: if the name returns a different number, or the number returns a different company, you have a mismatch to resolve before signing.
Open View Details on the record
The results card shows only the company name and its technologies. View Details adds the certification number, the certification body, the business address, the regions covered, the technologies held and whether the business is registered for the Boiler Upgrade Scheme. Each of those fields answers a different question, set out in the table below.
Screenshot the record and date it
Save a dated screenshot of the record with your quote. If certification is later withdrawn or the grant claim stalls, that screenshot shows the business was on the register when you signed.
Re-check before the install date
Certification is not permanent. Run the same search again in the week before installation. The installer must hold certification for the technology when the grant is claimed, not only when the quote was written.
What does each field on the MCS record tell you?
| Field on the record | What to look for | What a problem looks like |
|---|---|---|
| Company name | The same legal entity named on your quote and contract | A different trading name with no explanation of the link between the two businesses |
| Certification number | An exact match to the number on the quote | The number returns no result, or returns another company |
| Technologies | Air Source Heat Pump (or Ground/Water Source for a ground loop) | Solar PV or battery storage only: a real MCS business that cannot certify your heat pump |
| Registered for the Boiler Upgrade Scheme | Shown as registered | Not registered: the business cannot submit your grant application to Ofgem as things stand |
| Certification body | A named body such as NAPIT or NICEIC | None listed, which points to an incomplete or wrong record |
| Regions covered | Your nation and region | Your area missing: ask who will carry out the work and whether that business is certified |
The technology field catches the most common honest mistake. A solar installer moving into heat pumps holds a genuine MCS number, so the number search succeeds, but the record lists no heat pump technology. That installer cannot issue an MCS certificate for your heat pump, and without that certificate there is no grant.
What does an MCS number actually prove?
A live MCS record proves four things about the business:
- It passed an assessment by a certification body against the MCS heat pump standards, which split design (MIS 3005-D) from installation (MIS 3005-I).
- It remains under surveillance. Certification bodies return to inspect completed work; under the redeveloped MCS scheme the number of site visits rises for higher-risk installers and falls for those with clean records.
- It can register your installation on the MCS Installation Database and issue the MCS certificate that the grant and your paperwork depend on.
- It answers to MCS. Consumers can now raise complaints about an MCS installer directly with MCS.
It proves nothing about the following:
- Whether the system is designed for low flow temperatures, the biggest single driver of running costs
- Whether the engineer on your job holds F-Gas certification (an individual qualification, separate from the business's MCS status)
- Whether the price is fair or the business is financially sound
- Whether the business has fitted your chosen brand of heat pump before
Those gaps are what the other checks in our installer vetting guide cover, and why quality networks such as Heat Geek sit on top of MCS rather than replacing it. For how MCS relates to TrustMark, RECC and HIES, see our guide to installer accreditation.
How does MCS certification decide Boiler Upgrade Scheme eligibility?
The Boiler Upgrade Scheme (BUS) is the government grant for replacing fossil-fuel heating in England and Wales, administered by Ofgem. GOV.UK lists the amounts as £7,500 for an air source or ground source heat pump, £5,000 for a biomass boiler and £2,500 for an air-to-air heat pump. Until March 2027, a home heated by oil or LPG with no mains gas connection gets an extra £1,500 towards an air or ground source heat pump - see our £9,000 oil and LPG guide.
The money never passes through you. GOV.UK states that the installer applies on your behalf on the Ofgem website and takes the grant off your invoice. That design is why the MCS record matters so much: only an MCS-certified business can make the application, so your installer's certification status is your grant eligibility.
Three points on the record map onto the grant:
- Technology. The record must list the technology you are buying. MCS's own search currently shows no certified installers for air-to-air heat pumps, so check this field closely before relying on the £2,500 air-to-air grant.
- BUS registration. The Find an Installer filter for Boiler Upgrade Scheme registration narrows results to businesses set up to apply.
- Timing. Once Ofgem issues the voucher, an air source installation must be completed within three months and a ground source one within six. Certification has to hold for that whole window.
For the application itself, step by step, see our BUS application walkthrough.
What is changing in MCS during 2026 and 2027?
MCS is moving every installer onto a redeveloped Installer Scheme, and certification bodies are transitioning businesses as they come up for renewal. NAPIT's August 2026 guidance to its members sets out what changes:
- A March 2027 deadline. A business that has not transitioned by then is withdrawn from MCS certification. A long install queue that crosses that date is a reason to re-check the record before work starts.
- The Customer Commitment replaces mandatory consumer code membership for transitioned businesses. RECC or HIES membership remains required for heat pumps under BUS while a business is still on the current scheme.
- New financial protection. MCS Approved Financial Protection Products replace the old insurance-backed guarantees. Ask which product covers your deposit and workmanship.
- A named Technical Supervisor replaces the Nominated Technical Person as the person accountable for installation quality.
- Complaints go straight to MCS. Centralised complaints handling is already live.
For you, the practical effect is simple: a record that was live in spring is not guaranteed to be live next spring, so run the lookup at signing and again before installation.
Which results on the register mean you should stop?
These are the register-specific warning signs. General red flags about quotes, deposits and sales pressure live in our vetting guide.
No result for the number. Either the number was mistyped or it is not live. Ask the installer to confirm it in writing and search again. A second miss ends the conversation for a grant-funded job.
Number and name point to different businesses. Group companies and acquisitions create honest mismatches. Ask which entity signs your contract and which entity's number goes on your MCS certificate. Those two have to be the same certified business, or a subcontracting arrangement the certified business accepts responsibility for.
No heat pump technology on the record. The business is certified for something else. It cannot certify your heat pump.
"MCS pending". A business with an application in progress has no record to check and cannot apply for your grant. Wait until the record appears, or choose a certified installer.
"We work under someone else's MCS." Some installers trade under a larger certified business. Find out which business's number appears on your certificate, check that business's record, and get its responsibility for your installation in writing.
How do you check the installation after it is finished?
The MCS Installation Database is the central record of every MCS-certified installation. When the job is done, the installer registers it there and issues your MCS certificate, which carries a unique certificate number, your address and the installer's details. The certificate matters beyond the grant: you need it to sell the house with the heat pump's paperwork in order, and for warranty claims.
Check three things on the certificate: the installer name and certification number match the record you screenshotted, the address is correct, and the technology is right. If no certificate arrives, chase the installer first, then contact MCS. Pair this with our commissioning checklist on handover day.
Frequently asked questions
Is the MCS Data Dashboard the place to check an installer?
What format is an MCS certification number?
Does Find an Installer show whether certification is suspended?
Can I get the grant if my installer loses MCS certification mid-job?
Does MCS certification cover the engineer who fits my heat pump?
Who do I complain to about an MCS installer?
The five-minute summary
Search the certification number on Find an Installer, open View Details, and confirm the company name, a heat pump technology and Boiler Upgrade Scheme registration. Screenshot it, re-check it before installation, and match it against your MCS certificate at handover. That one record decides whether your grant goes through; the rest of the installer's quality you judge with the other checks in our vetting guide.

How to Vet an MCS Installer

Boiler Upgrade Scheme Explained

Heat Geek Explained
